Factory wholesale Terry Towel Knitting Machine - Three Thread Fleece Knitting Machine – Morton
Factory wholesale Terry Towel Knitting Machine - Three Thread Fleece Knitting Machine – Morton Detail:
MODEL | DIAMETER | GAUGE | FEEDER |
MT-TF3.0 | 26″-42″ | 18G–46G | 78F-126F |
MT-TF3.2 | 26″-42″ | 18G–46G | 84F-134F |
Machine Features:
1. Suspended Wire Race Bearing Design enable the machine improving running precision and ruducing impact resistance.
At the same time, the drive energy consumption is greatly reduced.
2. Using aircraft aluminum aolly on main part of machine to improve heat dissipation performance and reduce force deformation of the cam box.
3. One Stitch Adjustment to replace the visual error of the human eye with machining accuracy, and the accurate scale display with the high-precision Archimedean adjustment makes the replication process of the same cloth on different machines simple and easy.
4. Unique machine body structure design breaks through traditional thinking and improves machine stability.
5. With central stitch system, higher accuracy, simpler structure, more convenient operation.
6. New sinker plate fixing design,eliminating deformation of sinker plate.
Morton Fleece Machine Interchange Series can be interchanged to terry, and single jersey machine by replacing the conversion kit.
Product detail pictures:




Related Product Guide:
With our abundant experience and considerate products and services, we have been recognized to be a reputable supplier for a lot of global consumers for Factory wholesale Terry Towel Knitting Machine - Three Thread Fleece Knitting Machine – Morton , The product will supply to all over the world, such as: Brazil, Rome, Casablanca, We have advanced production technology, and pursuit innovative in products. At the same time, the good service has enhanced the good reputation. We believe that as long as you understand our product, you must be willing to become partners with us. Looking forward to your inquiry.

This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
