High Loop Pile Knitting Machine - High Production Terry Knitting Machine – Morton
High Loop Pile Knitting Machine - High Production Terry Knitting Machine – Morton Detail:
MODEL | DIAMETER | GAUGE | FEEDER |
MT-EC-TY2.0 | 30″-38″ | 16G–24G | 60F-76F |
Machine Features:
1 Suspended Wire Race Bearing Design enable the machine improving running precision and ruducing impact resistance.
At the same time, the drive energy consumption is greatly reduced.
2 Using aircraft aluminum aolly on main part of machine to improve heat dissipation performance
and reduce force deformation of the cam box.
3 One Stitch Adjustment to replace the visual error of the human eye with machining accuracy,
and the accurate scale display with the high-precision Archimedean adjustment makes the
replication process of the same cloth on different machines simple and easy.
4 Unique machine body structure design breaks through traditional thinking and improves machine stability.
5 With central stitch system, higher accuracy, simpler structure, more convenient operation.
6 New sinker plate fixing design,eliminating deformation of sinker plate.
Morton Single Terry Machine Interchange Series can be interchanged to single and three-thread fleece machine by replacing the conversion kit.
Product detail pictures:



Related Product Guide:
Assume full responsibility to meet all demands of our clients; achieve continuous advancements by promoting the growth of our clients; become the final permanent cooperative partner of clients and maximize the interests of clients for High Loop Pile Knitting Machine - High Production Terry Knitting Machine – Morton , The product will supply to all over the world, such as: Guinea, Uruguay, Iran, Upon today, we have customers from all over the world, including USA, Russia, Spain, Italy, Singapore, Malaysia, Thailand, Poland, Iran and Iraq. The mission of our company is to provide the highest quality products with best price. We are looking forward to doing business with you!

This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
